Marina del Rey is one of the most desirable coastal communities in greater Los Angeles — a waterfront enclave where condominiums, townhomes, and single-family homes adjacent to the marina and beaches command values of $1.5M–$6M+. Construction and renovation in Marina del Rey requires both coastal permitting expertise (the entire community is in the California Coastal Zone) and the craftsmanship appropriate for high-value coastal properties. APLA Construction (CA Lic #1136359) is a licensed general contractor serving Marina del Rey homeowners for kitchen remodels, ADUs, room additions, full home remodeling, and bathroom renovations.
Marina del Rey kitchen renovations are typically coastal contemporary in design — open plan, light-filled, with indoor-outdoor connections and durable surfaces appropriate for beach living. Full renovation: $65,000–$180,000. APLA handles all City of LA / LADBS permits for Marina kitchen projects. Call (818) 818-4419 for a free estimate.
Marina del Rey ADUs benefit from proximity to Silicon Beach, LAX, and the beach — generating $2,500–$4,500/month in rental income for 400–700 sq ft units. Single-family Marina homes can accommodate detached ADUs in rear yards; garage conversion ADUs are common on Marina lots with existing garages. APLA manages all LADBS and Coastal Commission permit requirements.
Marina del Rey bathrooms benefit from spa-style renovation: walk-in showers, soaking tubs, heated floors, and waterproof design appropriate for coastal humidity and beach traffic. Primary bathroom renovation: $35,000–$95,000. APLA handles all scopes.
Full renovation of Marina del Rey single-family homes: $300,000–$600,000 for typical 1,400–2,200 sq ft homes. APLA manages all trades and coastal permitting under one contract.
Room additions in Marina del Rey require LADBS plan check plus Coastal Development Permit analysis. APLA provides permit feasibility review at the initial estimate — free for all Marina del Rey homeowners considering additions.
Marina del Rey is entirely within the California Coastal Zone. This means:
APLA evaluates CDP applicability for every Marina del Rey project before design begins, ensuring you know the full timeline and permitting requirements before committing to a scope.
Kitchen remodel: $65,000–$180,000. Bathroom remodel: $28,000–$95,000. Room addition: $180,000–$350,000. ADU construction: $170,000–$300,000. Full home remodel: $300,000–$600,000. APLA provides free written estimates for all Marina del Rey projects.
Interior-only renovations: typically no. Projects with exterior changes (new windows, additions, structural modifications): typically yes. APLA advises on CDP applicability for every Marina del Rey project at the initial consultation — at no cost.
Interior kitchen renovation: 9–15 weeks including LADBS plan check. Projects requiring a CDP: add 3–6 months for Coastal Commission review. APLA runs material procurement during the permit phase to compress the total project timeline.
Yes. APLA builds ADUs in Marina del Rey, managing coastal permitting and LADBS plan check. Marina del Rey ADUs rent for $2,500–$4,500/month, making them among the better ADU investments in the South Bay.
Call: (818) 818-4419
Email: info@aplaconstruction.com
CA General Contractor License #1136359
APLA Construction serves Marina del Rey, Venice, Playa del Rey, Culver City, Santa Monica, and all of greater Los Angeles. APLA Construction Home | ADU Construction | Home Remodeling