Burbank homeowners are remodeling bathrooms at a strong pace in 2026 — updating the dated tile and fixtures of the neighborhood post-war housing stock and converting underperforming bathrooms into functional, modern spaces. Whether you are refreshing a small hall bath in Magnolia Park, renovating a primary bathroom in the Chandler Estates, or doing a full spa conversion in the Rancho District, APLA Construction (CA Lic #1136359) handles every scope of bathroom remodeling in Burbank.
See the full Los Angeles bathroom remodel cost guide.
Burbank operates its own Building and Safety Division — separate from LADBS. All bathroom remodel work involving plumbing modifications, electrical panel work, or structural changes requires permits from the City of Burbank. APLA manages all Burbank permit submissions, plan check submittals, and inspection scheduling. Cosmetic bathroom work (replacing fixtures on existing supply lines, new tile without plumbing relocation) may not require a permit — APLA evaluates this at the estimate stage.
Removing an original 1950s tub-shower combo and replacing it with a frameless glass walk-in shower is the single most-requested bathroom project in Burbank in 2026. The conversion requires demo of the existing tub surround, a new shower pan or tile base, new plumbing drain, new supply lines, and a frameless glass enclosure. Cost to add to a remodel: $15,000–$32,000.
Replacing a builder-grade vanity with a floating custom vanity, new countertop, and a large framed mirror is the most cost-effective way to transform a bathroom. Cost as a standalone project: $4,500–$12,000. As part of a full remodel, these elements are included in the base scope.
Electric radiant floor heating is increasingly standard in Burbank primary bath renovations. Cost to add: $3,000–$6,500 for most bathroom sizes. Requires a dedicated electrical circuit and is installed under the tile during construction.
A guest bath remodel in Burbank runs $34,000–$58,000. A mid-range primary bath renovation runs $60,000–$98,000. A high-end spa conversion runs $98,000–$160,000+. Prices include design, permits through the City of Burbank Building and Safety Division, and all construction through final inspection.
Guest bath including permit: 8–12 weeks total. Mid-range primary bath: 11–16 weeks. High-end spa conversion: 15–22 weeks. City of Burbank permit processing for bathroom remodels typically runs 3–6 weeks.
Yes. APLA Construction handles bathroom remodels throughout Burbank. We are based in the San Fernando Valley and work in Burbank regularly. Call (818) 818-4419 for a free in-home consultation and written estimate.
Yes, for any work involving plumbing changes, electrical work, or structural modifications. Purely cosmetic work generally does not require a permit. APLA determines permit requirements at the initial project assessment and handles all Burbank Building and Safety submissions.
Call: (818) 818-4419
Email: info@aplaconstruction.com
CA General Contractor License #1136359
Serving Burbank, Glendale, Studio City, Toluca Lake, North Hollywood, and the San Fernando Valley. See our full Home Remodeling Burbank guide.