Studio City is one of the most desirable addresses in the San Fernando Valley — and one of the strongest ADU rental markets in Greater Los Angeles. The neighborhood’s walkable Ventura Boulevard corridor, proximity to CBS Studios and Universal City, and strong connection to the Westside via Laurel Canyon make ADU rentals here highly sought after by entertainment industry professionals and young professionals alike. APLA Construction (CA Lic #1136359) builds garage conversions, detached ADUs, and JADUs throughout Studio City.
Studio City is within the City of Los Angeles. ADU permits are processed through LADBS with the state-mandated 60-day processing time. APLA manages all LADBS submittals, plan check responses, and inspection scheduling for Studio City ADU projects. Studio City properties in the hillside areas above Mulholland Drive may require geotechnical review — APLA assesses this for each property at project start.
A one-bedroom ADU in Studio City rents for $2,100–$3,100/month — among the highest in the Valley, reflecting Studio City’s premium location and entertainment industry rental demand. A well-finished two-bedroom ADU commands $2,700–$3,700/month. Payback period on a garage conversion ADU is typically 5–7 years.
See our full 2026 ADU cost guide for Greater Los Angeles.
Before sizing a Studio City ADU, check maximum ADU size by type — detached units, attached units and JADUs are each capped differently, and lot coverage often binds before the state cap does. And because Studio City ADUs are so often built to rent, it is worth knowing what an ADU does to your property tax assessment before the project starts rather than when the bill arrives.
A garage conversion ADU in Studio City costs $82,000–$142,000 in 2026, including design, LADBS permits, and all construction. A detached new-construction ADU runs $145,000–$280,000. Studio City’s high rental rates ($2,100–$3,100/month) make ADU investment especially attractive here.
A Studio City garage conversion ADU takes approximately 8–12 months from start to Certificate of Occupancy: 3–5 weeks for design, 45–70 days for LADBS permit processing, and 10–16 weeks for construction. A detached new-construction ADU takes 13–18 months total.
Yes. APLA Construction builds garage conversions, detached ADUs, and JADUs throughout Studio City. Call (818) 818-4419 for a free on-site evaluation.
Call: (818) 818-4419
Email: info@aplaconstruction.com
CA General Contractor License #1136359 — verify on CSLB
Serving Studio City, Sherman Oaks, Encino, Toluca Lake, North Hollywood, and the Cahuenga Pass corridor. ADU construction and permitting in Studio City
More APLA Construction ADU guides and local services for Studio City homeowners: