Sherman Oaks is one of the most active ADU markets in the San Fernando Valley. With large lots, strong rental demand, and a sophisticated homeowner base that understands the ROI of ADU construction, Sherman Oaks sees consistent ADU activity year-round. APLA Construction (CA Lic #1136359) is a Valley-based ADU contractor building garage conversions, detached ADUs, and JADUs throughout Sherman Oaks and the surrounding Valley communities.

ADU Types We Build in Sherman Oaks

Sherman Oaks ADU Permits (LADBS)

Sherman Oaks falls within the City of Los Angeles, meaning ADU permits go through the Los Angeles Department of Building and Safety (LADBS). California state law mandates that LADBS process ADU permits within 60 days of a complete submittal. In practice, APLA’s Sherman Oaks ADU projects typically receive permit approval in 45–70 days. APLA handles all LADBS submittals, plan check responses, and inspection coordination.

ADU Rental Income in Sherman Oaks

A one-bedroom ADU in Sherman Oaks rents for $1,900–$2,600/month. A two-bedroom unit commands $2,500–$3,300/month. Sherman Oaks’ proximity to Studio City, Universal City, and the 405 Freeway keeps rental demand strong from entertainment industry workers and Valley professionals alike. The payback period on a garage conversion ADU is typically 5–7 years via rental income.

See our full 2026 ADU cost guide for Greater Los Angeles.

Why Sherman Oaks Homeowners Build ADUs

Frequently Asked Questions — ADU Contractor Sherman Oaks

How much does a garage conversion ADU cost in Sherman Oaks?

A garage conversion ADU in Sherman Oaks costs $80,000–$140,000 in 2026 for a complete project including design, LADBS permits, and all construction through Certificate of Occupancy. Sherman Oaks falls under LADBS jurisdiction with efficient ADU processing and no additional city fees beyond standard LADBS rates.

How long does an ADU take in Sherman Oaks?

A Sherman Oaks garage conversion ADU takes approximately 8–12 months from project start to Certificate of Occupancy: 3–5 weeks for design, 45–70 days for LADBS permit processing, and 10–16 weeks for construction. A detached new-construction ADU takes 12–18 months total.

Does APLA build ADUs throughout the San Fernando Valley?

Yes. APLA is Valley-based and builds ADUs throughout Sherman Oaks, Studio City, Encino, Tarzana, Van Nuys, Woodland Hills, Burbank, and the broader San Fernando Valley. Call (818) 818-4419 for a free on-site estimate.

Get a Free ADU Estimate in Sherman Oaks

Call: (818) 818-4419
Email: info@aplaconstruction.com
CA General Contractor License #1136359

Valley-based. Serving Sherman Oaks, Studio City, Encino, Tarzana, Van Nuys, Woodland Hills, and all of the San Fernando Valley. Learn more about our ADU construction services.