Koreatown is one of the densest and most active remodeling markets in Los Angeles — a neighborhood where older building stock, active investment in renovation, and a high-demand rental market all converge. Located just west of Downtown LA along Wilshire Boulevard and Olympic Boulevard, Koreatown’s housing includes pre-war courtyard apartments, 1950s–1960s garden apartments, vintage single-family homes, and significant commercial-residential mixed-use development. APLA Construction (CA Lic #1136359) serves Koreatown with general contracting for residential remodeling, ADU additions, and interior renovation projects.
Koreatown kitchen remodels reflect the neighborhood’s diverse ownership base and rental investment context. Single-family and condo kitchen remodels: $28,000–$95,000 for a full mid-range renovation. Investment property kitchen updates: $15,000–$32,000 for a functional refresh that improves rental competitiveness.
Primary bathroom and hall bathroom renovations in Koreatown’s older single-family homes and condominiums. Full bathroom remodel: $20,000–$65,000. Accessibility-focused bathroom renovations (for owners with mobility needs): same scope with grab bars, roll-in shower, and wider doorways included.
Koreatown has significant opportunity for ADU construction on SFR lots. Garage conversion ADUs are most common where detached garages exist. Koreatown’s dense urban setting means some lots are constrained for ADU placement — APLA evaluates each property for ADU eligibility during the initial free consultation. ADU rents in Koreatown: $1,800–$2,800/month for a studio or 1BR.
Koreatown’s older SFR stock (1920s–1960s bungalows and Spanish Colonials) is an active renovation market. Full gut renovation: $120,000–$280,000 depending on size and scope. These projects include kitchen, bathroom, electrical panel upgrade (many K-Town homes still have 100A service), plumbing repipe, and finishes throughout.
Koreatown is in the City of Los Angeles — all permits through LADBS. Central LADBS location is accessible from K-Town. No Coastal Zone, no typical HPOZ overlay (though parts of adjacent neighborhoods have historic designations). Standard LADBS plan check: 3–6 weeks for kitchen/bathroom, 5–10 weeks for additions.
Kitchen remodels, bathroom renovations, ADU additions (garage conversion and new construction), whole-house renovation, electrical panel upgrades, and room additions in Koreatown residential properties.
General contractor markup in Los Angeles: 15–25% on subcontractor labor and materials. Project management fees are built into the total contract price — not charged separately. APLA provides fixed-price contracts for all defined scopes.
Yes. APLA (CA Lic #1136359) serves Koreatown, Downtown Los Angeles, Mid-City, and the broader central LA area. Call (818) 818-4419 for a free in-home estimate.
Call: (818) 818-4419
Email: info@aplaconstruction.com
CA General Contractor License #1136359
General Contractor Los Angeles | Home Remodeling Los Angeles | ADU Contractor Los Angeles